Top-Down Construction
Slip-form can operate 24 hours, seven days a week, if required by a programme. It provides an efficient and fast method of constructing vertical structures.
On larger slip-form rigs, such as on The Shard London Bridge, we were able to accommodate a rig-mounted crane providing significant benefits to the vertical logistics strategy.