SCOPE OF WORK
The works to a new International Banking HQ on Canary Wharf consists of a 48-storey in situ concrete core and substructure construction. The core comprised shafts for 12 passenger elevators and escape stairs was constructed using an Automatic Climbing shutter system. Superstructure construction was structural steel with composite lightweight concrete floor slabs. |
|  | LOCATION Canary Wharf, London |  | CLIENT Canary Wharf Contractors |  | ARCHITECT Foster + Partners |  | ENGINEER Ove Arup |
|  |
|