SCOPE OF WORK
Byrne Bros carried out this project in two phases and was responsible for constructing both the sub and superstructure. The sub-structure was particularly interesting as it was built using the ‘top-down’ method of construction. The superstructure was brick clad externally with high quality finishes internally.
|
|  | LOCATION St Pancras, London |  | CLIENT British Library |  | MAIN CONTRACTOR Laing |
|  |
|